What does it take to create the largest show in the Mercedes Benz Arena

  • 37 Cameras
  • 4 Jibs
  • 21 Unilateral broadcast feeds
  • 32 HD feeds to L.A. via Fiber 120ms of latency
  • Vision Mix in Los Angeles
  • 3 Host Broadcasting setups onsite
  • 9 MADI fiber lines (576 audio tie lines)
  • 121 metric tons rigged to ceiling
  • 1.9km trussing
  • 368 rigging points
  • 1500 moving lights
  • 73 truck loads of equipment
  • 40km of cable
  • 3300 cases of equipment
  • 40 Hours to load in
  • Loaded out in 9.5 hours
  • The entire EU inventory of Mythos lights (300)
  • 2689 currywurst (meals)
  • 5500 amps of power needed
  • 1497 hotel nights
  • 2667 LED Video Tiles
  • 380m LED Rope Light
  • 800 Gigs of graphics content
  • 400 Pyro Elements
  • 320lbs of liquid CO2
  • 1250m pyro cable
  • 320m2 glass flooring
  • 115 radios
  • 18m tall cylindrical Kabuki
  • 166 flights
  • 15000 audience seats sold in 6 minutes

Our Amazing Work

We love what we do!

PA_Logo_RW_200

Copyright Production Associates, Ltd. 2017 © All Rights Reserved